Dredging of the Kurca main channel

As a continuation of a previous IPA investment, between the 4+847-9+997 km sections, the dredging of the
Kurca main channel involves the removal of the aggradation / bed material / from the channel bed, and the clearing of the bed and slope on a further 5.150 linear meter long section.

program slogan